|
Lenox, Massachusetts Lenox Middle/High School is an addition renovation project which replaces a 20 year old portable classroom assemblage with a new two story middle school classroom wing. An inadequate library is replaced by a new library located at the school main entry. A performing arts space is added at the end of the existing building. The entire facility is handicapped accessible, and the original electric heat is replaced by a circulating hot water system. Areas for science, art, and administration are significantly upgraded. The school houses 505 students in 34,640 s.f. of new construction and 69,360 s.f. of renovated areas. |